Sales were in Odoo, manufacturing in another program
The company designs and builds one-off equipment, each unit for a specific order. Its sales and projects were already in Odoo. Everything on the factory side, from purchasing to production, was still in a separate program.
In between, there were spreadsheets. The Technical Office prepared each unit's bill of materials in a spreadsheet and then keyed it by hand into the other program, and order tracking lived in an Excel file of around three hundred lines.
Hours were logged against projects, but with no hourly cost. And invoices and hours went through different analytic plans that never met.
- Bills of materials in spreadsheets, typed in twice
- An Excel file to track orders
- Hours on projects, with no cost
- Purchasing and warehouse outside the ERP
The project at the centre, and a manufacturing order for each unit
The sales process stays as it is: the sales order, its versions and its addenda carry on as they do today.
The bill of materials, written in Odoo
The Technical Office writes each unit's bill of materials in Odoo and buys what the project needs. The step from spreadsheet to the other program disappears.
One order per unit
Each unit has its own manufacturing order, which is closed once the unit is built. On-site assembly is measured per job and goes on a project order.
Planned versus actual
The budget is recorded when the project is opened; the plan comes from the bill of materials and the production hours. The actual cost is compared with both.
Purchases charged to the project
Whatever is bought for a unit is charged to its project on receipt, without going through stock, which is kept for warehouse material.
Time tracking on the shop floor
The workshop clocks in and out in Odoo from the first working day on the new system. The rest of human resources arrives before the end of March.
Design first, then code
The first milestone was a functional design the company signed off in October 2026. We went through its 41 processes with it and mapped them to Odoo 19: 5 are covered by the standard, 17 by configuration and 19 by some development, almost all of it small and grouped into two modules. Each specification has its acceptance criteria written down, so that 'done' means the same thing to both sides.
Purchase, Manufacturing, Quality and Attendances were already included in its Odoo subscription and weren't being used. Inventory and Project are switched on and extended. Human resources is set up with two of our own modules, which we provide with no licence fee.
The project is at a fixed price and invoiced by milestones, each one when the company signs it off.
Coding started in October. At the same time, the company is cleaning up its materials master with a template of ours, and an importer compares the export from its design software against the bill of materials before anything is loaded. It's the manufacturing in Odoo method, with the custom development the standard doesn't cover.
As of mid-November, the company has already delivered its first complete bill of materials for loading into Odoo, and go-live is still set for January.
Go-live in January, without two programs running side by side
The old program closes with the year. From the first working day of January, everything new is done in Odoo, from stock to projects.
Projects that run from one year into the next are also opened in Odoo at the cut-over, with the cost they carry and their pending purchases. Before that, in December, there's a pilot with real data in a test environment.
The dashboard and the rest of human resources arrive in the first quarter. It's what the whole design is aiming for: seeing the actual cost of each unit next to what was budgeted.